You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Version 0.2.4

  1. Update to Sourcing Contact Service (Available in Acceptance to Test from 12 Feb)
    1. The Union database will apply a transition period of three months (until 30th April 2024) to allow all first gathering points to provide the NTR IDs of all points of origin listed in the database and linked to them. During this grace period, it will be possible to add sourcing contacts (points of origin) without the NTR ID, if it is not known. UDB will generate a temporary NTR id for a certain period of time. This need to be replaced in future if the original NTR Id is available.
  2. Add / Update Organisation (Available in Acceptance to Test from 19 Feb)
    1. Possibility to replace an existing NTR id with new NTR. If the ‘OLD_ ECONOMIC_OPERATOR_NUMBER’ operator field is filled in (it is optional) then UDB will find the old NTR and replace it with new one mentioned in ‘ECONOMIC_OPERATOR_NUMBER’ field

    2. Verify if the NTR ID is valid as per the EC Standards. If NTR ID is not respected organization will not be created.

  3. POS Data Update (Available in Acceptance to Test from 12 Feb)
    1. POS Data section has been updated to caption addition Emission details. In exchange model these fields are optional, but the application will mandate it based on the GHG method type chosen.

    2. For eg IF GHG Method type chosen is DDV_AV then the EEC_AV_DDV should be filled in with either DDV or AV


  • No labels