titleEO Questions
Expand
titleIn the demo it shows mass balance duration for 12 months and it seems it cannot be edited. Shouldn’t this be 3 months?

Response: 

We have mass balance for 1, 2, 3 and 12months, once provided by EO it cannot be edited .We plan to implement edit of mass balance duration by certification body only . 

Expand
titleIf holding Nabisy POS in a mass balance will mapping of Nabisy POS codes to UDB material codes be provided? Will Annex IX status align with member state lists?

Response: 

On UDB a certified material at the point of production is based on certification subject by the schemes that are compliant to RED. It is not allowed and is illegal to relabel the same material to another name. For the purpose of promotion a Member states may decide to interpret the same material differently within the member state. Such cross-referencing can be done by the member states during harmonization process initiated by the member states with Union Database. This will however not lead to change in Annex IX status. 

Expand
titleWill aviation fuel suppliers be expected to record a transaction for each individual flight? Or can these be aggregated on a monthly/quarterly/annual basis?

Response: 

We do not for each flight. Only what’s delivered from EO to EO consignments

Expand
titleWhat is a non-primary residual flow?

Response: 

primary residual flows' refer to 'agricultural, aquaculture, fisheries and forestry residues and wastes'
and 'non-primary residual flows' refer to 'processing residues and wastes'.

Expand
titlePlease can you show us how to trade corn bought under different certification scheme, KZR Inig, when we are in UDB just ISCC certified holder.

Response: 

When you are buyer we do not ask for certification details

Expand
titleHow can fuel suppliers remove biofuel from their stocks when this fuel has been used against e.g SAF mandate?

Response: 

Basically remove means report that the fuel has been use. We use put-on-market to register this.

Expand
titleWould an ISCC certified Point of Origin for waste and residues fall in this Part B trade scope?

Response: 

If your ISCC certificate has collection point scope you can use Part B scope . 
If you certificate possess only point of origin scope we are developing special trade for it where you will be able to register your transaction..

Expand
titleHow far in the pipeline is the mass upload ability? We would need it for every section.

Response: 

We are working on this and we expect this by end of Q2

Expand
titleYou cannot use tdv for Used cooking oil. Can you explain why you can choose multiple actions?

Response: 

TDV not needed for UCO

Expand
titleIs there actually an error event on the UDB database as the site is not loading fully (I've tied 2 different browers)?

Response: 

Please provide more details on the site information.

Expand
titleif UDB can be used as MB but it only registers sustainable product how is mass balancing within mass balance quarter between sust and non sust still possible?

Response: 

UDB does not register non-sustainable quantities. Regarding your specific question please discuss with your  scheme

Expand
titleAs CP,how could we add input transactions from POs in bulk?There are small transactions from DIFFERENT POs and a bulk option would be more efficient.E-delivery?

Response: 

Bulk upload of sourcing contact is available .
Bulk upload for Transaction is not available and will be announced when its available.

Expand
titleWe are producing B100. How can we dissociate the selling transaction of the B100 and the selling transaction for the POS (the customers are different) ?

Response: 

Each sale is unique and will create a unique POS in UDB.

Expand
titleWhen using e-Delivery for transactions will an economic operator be able to transact with other voluntary scheme operators? For example ISCC to RedCert sale.

Response: 

Yes , this will be possible.

Expand
titleHow can we receive a buyer transaction for biogas sourced from UK via the grid? We have understood that those volumes will not be included in the UDB.

Response: 

UK will be part of Eu grid.

Expand
titleWhy does only the buyer have the ability to determine the destination? Sometimes the seller handles delivery and the buyer may not be registered on UDB.

Response: 

Both buyer and seller can enter the delivery location if its already known. If the buyer not registered in UDB it will be marked as consumed .

Expand
titleCan the GHG UOM be changed? E.g. for feedstock, we would like to enter DDV value in gCO2eq/MJ instead of kgCO2eq/dryton

Response: 

For feedstock MJ is only for fuels and Dry tone is for RM. UOM depends on the registered material type.

Expand
titleHow can you delete transactions sold outside UDB scope?

Response: 

1. If outside UDB scope means EO not using UDB scope you can register this transaction in UDB mentioning the Required EO details.
2. If it means non sustainable consignment you don't need to register it in UDB.
If you want to remove it from your mass balance this feature will be possible in future.

Expand
titleHow can the mandates be met with only UDB reported volumes if not all EO's (e.g. those that are only certified under a national scheme) are listed in UDB?

Response: 

Non certified EO's can be imported into UDB for the transaction.

Expand
titleWill there be possible to use NUTS3 codes for Romanian sustainable raw materials into UDB? Or only DDV is available in UDB?

Response: 

The NUTS2 values need to be the ones subject to a decision by EC (RED II), Currently only NUTS2 value for Argentina & and Australia are approved by EC directives.

Expand
titleIf the Blue PoS received can only be registered in UDB at start of next MB period, how can we supply the PoS within 30 calendar days as required?

Response: 

If the Blue PoS received can only be registered in UDB at start of next MB period, how can we supply the PoS within 30 calendar days as required?

Expand
titleWhen Mode of Transport and Transport Distance is filled within the transaction sheet, does the UDB calculate automatically the Transport emissions Etd?

Response: 

UDB does not automatically calculate the emissions and is needed to share to EO further in the value chain. This is the responsibility of the EO

Expand
titlecan we accumulate in one buyer trade all volume delivered on different dates in 1 transaction provided same GHG charectaristics and country of origin apply? In the case of feedstocks this should also be unique from the farm.

Response: 

Yes.. you can accumulate all volumes for the same point of origin, same GHG and same country of origin.

Expand
titleAll the examples have been registered in a future date (8/04/2024), can we register a transaction made in the past?

Response: 

The transactions can be registered in the past as long as it is within the certification validity

Expand
titleit is not fully clear for me, do we need or not need to retrospectively register all transaction back to 1 January 2024?

Response: 

All transactions after 1st Jan 2024 have to be on UDB

Expand
titleNot all the National Schemes are registered yet, eg. Sweden. How do we make sure that these tonnages are compliant and entered into the UDB?

Response: 

National schemes should notify EC, DG ENER about the National scheme so that the scheme can be onboarded on UDB. National schemes should further onboard the economic operators and their certificates on UDB

Expand
titleAs Trader,when materials stored in an independent ISCC Cert. warehouse.How can we register transactions indicating location of materials as ISCC Cert Warehouse?

Response: 

Regarding an Independent storage site, an trader should ensure this site is listed under his certificate to be able to use the warehouse as the location for the consignments

Expand
titleHow can we register initial stock unless all our suppliers are ready to send future PoS documents electronically?

Response: 

Initial stocks is one time registration. It can be registered on UDB based on sustainable stocks held as of 1st January 2024

Expand
titlewill UDB replace the mass balance document?

Response: 

UDB is digitizing all sustainable materials as part of traceability. As such UDB will be able to demonstrate Mass-balance of such materials that can only be part of UDB. This view may not be the same as physical stocks held by EO and as such. It is not intended for UDB to replace Mass-Balance document at this point in time.

Expand
titleHow often intakes should be registered into UDB? Is there a time frame?

Response: 

Could you please clarify the question

Expand
titleIf you are collecting product, but delivering it to a facility not under our ISCC license, how do we record the delivery location?

Response: 

The seller will have to indicate the buyer in a sale transaction. Buyer shall update the delivery location. If the Buyer is not on UDB or his site is not certified, it will be considered booked out.

Expand
titleWhy does UDB permit bundling PoO Trade for 3 months but require transactions to be reported within 72 hours? What's the reasoning behind these decisions?

Response: 

The topic of registering the transaction is explained in the user manual i.e. the 72 hours is applicable from the trigger point. The trigger point is based on economic operators business process giving flexibility to be based on consolidation of shipments under invoice etc.

Expand
titleHow will it work with if we sell ISCC material with Nabisy paper as PoS?

Response: 

Every Consignment should be registered on UDB with UDB PoS

Expand
titleIf our stocks are registered on 1 jan and a supplier fails to provide data in the UDB for a delivery after 1 jan but paper pos is provided, what should we do?

Response: 

All Consignments should be registered by your suppliers after 1st Jan

Expand
titleCan further guidance be provided by UDB team and ISCC on the mechanism for retrospectively adding POS and associated transactions in UDB from 1st January 2024.

Response: 

A supplier can register the transactions retroactively after 1st Jan 2024 in 2024

Expand
titleFor later, Is the input of the Initial stock on each mass balance centre of an EO definitively a one-time event? How will mass balance adjustments be settled?

Response: 

Input for initial stock is a onetime activity by the economic operator. Retroactive registration after 1st January allows the possibility for delayed submissions during the transition year. 

Expand
titlewhy do we have to manually enter the conversion ghg values for each conversion POS. This should be automated basis a fixed conversion rate (feedstock factor/FF)

Response: 

A template based auto conversion will be added in the backlog

Expand
titleHow is it possible to record sales transactions in UDB with a negative mass balance within the mass balance period (which is allowed by Red2)?

Response: 

In the current implementation we do not allow to record sales transaction with  negative mass balance.

Expand
titleAt present, only total GHG value is visible to the buyer. Will UDB offer visibility into the cumulative GHG values per categories (Etd, Ep, Ecc)? If yes, when?

Response: 

In the current implementation we do not show cumulative .

Expand
titleHow could we handle it when ISCC stock was sold to non ISCC contract/buyer?

Response: 

Possible to register transaction for non ISCC buyer , it will be called as Booked out . This feature is currently not available .

Expand
titleWill the sourcing contact’s ISCC number be automatically updated when they have a new certificate?

Response: 

ISCC is responsible for updating this.

Expand
titleHow is it possible to aggragate different ghg values on the highest in UDB as allowed vy RED2?

Response: 

The question needs to be clarified but the UDB allows to cumulate the GHG emissions. Each Economic operator can see the total GHG emissions cumulated until the previous  stage. 

Expand
titleOnce the UDB is fully operational will it still be necessary to issue SDs and POS outside the UDB or will it be enough to only issue SDs and POSs only in UDB?

Response: 

once UDB is fully operational and for the types of fuels covered the UDB PoS is the mandatory reference for sustainability certification and traceability. therefore, should be enough for such purposes.  

Expand
titleTo comply in Germany in 2024 BLE have advised POS needs to be in Nabisy. Is the expectation for 2024 we retrospectively upload this same POS into UDB as well?

Response: 

All consignments if not on UDB cannot be counted as sustainable if there is no corresponding UDB PoS. When Nabisys is integrated, Nabisy PoS should be integrated on UDB. 

Expand
titleThe comment regarding retroactive booking is remarkable: I have a massive concern origination can make all movements from 2023 crop available

Response: 

If the EO registers the consignment using Initial stocks for 2023 stocks they continue to be subject to audits during certification renewal

Expand
titleFuel suppliers often sell to customers in ambient litres (not kg or standard litres at 15 degrees C). Will UDB allow reporting in ambient litres?

Response: 

Ambient litres will be considered

Expand
titleIf we are a "collecting point" but do not physically collect the (Crude tall oil) from our mills, we send it to our warehouses. Where do we move the stock?

Response: 

In UDB you can use internal transfer option to move stock from one site to another site internally but the site need to be registered(Certified) .

Expand
titleAs CP, is it possible to add input transactions from POs in bulk? There are small transactions from small POs and a bulk option would be more efficient.

Response: 

Bulk Upload Transaction will included in the backlog

Expand
titleMy organisation has no Lead User in UDB and we have tried to contact you on different e-mails and on ISCC contact page. What is the easiest way to get support?

Response: 

All EO should contact your voluntary scheme .
For technical support-EC-UDB-SUPPORT@ec.europa.eu
For functional topics- EC-UNION-DB@ec.europa.eu.

Expand
titleCan a company have several users registered to work on the UDB?

Response: 

Yes, a company can have several 
users registered to work on a (UDB) system. 

Expand
titleI saw that Registering stock is not required. When will it be required?

Response: 

Point of origin Economic Operators like farmers & restaurants.
These types of EOs are not expected to participate in reporting trade transactions to UDB. 
The trades from POO shall be registered by 1st Gathering or collection point.

Expand
titleThe ISCC Cert. information for our company is not updated, hence it shows an expired certificate. Can we register our stock and transactions in this situation?

Response: 

Kindly contact your voluntary scheme to update the certificate if status is expired.
If the certificate is expired that certificate sites are not possible to register stock and transaction

Expand
titleHow can we write down yield losses in the UDB to ensure physical stocks match with mass balance?

Response: 

We plan to create adjustment/loss feature , In future buyer should be able to include adjustment/loss linked to the consignment  .

Expand
titleIf our certification number is incorrect in UDB, how can we get this fixed?

Response: 

If the certification number is incorrect, again we need to create a new certificate. Once the certificate has been created, certificate number edit is not possible

Expand
titleCan you add several user rights in one company?

Response: 

Yes, a company can have several users. 

Expand
titleI am confused about registering initial stock? Because out product is a waste, the amount is constantly changing. We input the amount of CTO at the mill?

Response: 

Feature would be available in future

Expand
titlePlease can you show us how we can process initial stock registration of corn with Eec from Slovakia region with NUTS 2 value 265kgCO2eq/t.

Response: 

The NUTS2 values need to be the ones subject to a decision by EC (RED II), Currently only NUTS2 value for Argentina & and Australia are approved by EC directives.

Expand
titleCan you better define what the stock is that we are registering? is it a truckload or shipment or current inventory at that location?

Response: 

The purpose of the initial stock registration 
is to allow economic operators to register an initial available sustainable stock of raw materials or fuels that would allow them later to trade. This feature will be available only during transitioning into the union database to enable economic operators to start registering transactions.
is it a truckload or shipment or current inventory at that location? 

Expand
titlePlease can you show us how we can process corn with Eec as DDV, which is mentioned in REDII in 25,5 gCO2/MJ and into UDB is needed to use kgCO2/t.

Response: 

For the raw material Corn unit, should be kgCO2eq/DMT. 
For all fuel type unit, should be gCO2eq/MJ.

Expand
titleHi, just to confirm, the Initial Stock MUST only be as of Jan 1st, 2024? No other future dates are possible?

Response: 

Initial stock held by the Economic Operator at a site listed in the certificate as on 1st January 2024 to be registered as a one-time activity to kick start the UDB application. 
Initial stock is the quantity available to the EO at a particular site as on 1st January 2024. Stock should be issued 1 st Jan 2024,
No other future dates are possible.

Expand
titleWe couldn't register a 2023 stock (for example - material: rapeseed (crop)) with NUTS2 method type. How could we register NUTS2 crop stocks to UDB?

Response: 

Currently for NUTS2 region available only for 
Argentina for the material Soyabean and Australia for the material Canola Seed
Material: rapeseed (crop)) with NUTS2 method type. How could we register NUTS2 crop stocks to UDB?

Expand
titleCan you upload several transactions at once? For example via excel.

Response: 

Bulk Upload Transaction is Feature for us to implement 

Expand
titleWhat do you do if after one time registering of initial stock a supplier who isn't using UDB sends you a blue POS? Can e-delivery be used for bulk upload?

Response: 

UDB POS is the true source of sustainability information in UDB.
Yes edelivery can be used for bulk upload.

Expand
titlemass balance duration is 12 months?

Response: 

Currently for registering certificate mass balance duration could be 1 months,2 months,
3 months or 12 months

Once the mass balance start date & duration is specified and the transactions are recorded on UDB, the transactions executed would be visible within the specific mass-balance period. The feature for Mass-balance period would be available within Q1 2024 for use. It is not necessary to specify the mass-balance start date for every period. The UDB will auto generate the mass-balance periods based on initial last known mass balance start date and duration. The carry forward of available stocks from one mass-balance period to the next will be automatically calculated for every new period, & hence it is not necessary to manually move the volumes.

Expand
titlewhat in case there is sustainable and non sustainable stock should both be registered or only sustainable stock?

Response: 

Only sustainable material will be traced on UDB except in the case of blending. 

With regards to sustainable fuel, only those consignment reported on UDB (by fuel producers) and further sold to fuel suppliers on UDB will be available to the final fuel supplier to mark the fuel as consumed in the market. Offline reporting of consignments put on market will not be allowed on UDB as this defeats the purpose of UDB from traceability point of view and will lead to double counting/ irregularities. EO would have the report of all consignments put for consumption by final fuel suppliers on real time basis. Additionally an annual report can be extracted by both EO and the Member states for sustainable fuel.

Expand
titleHey, why is it mandatory to enter a company reference number?

Response: 

Company reference should be the Internal company reference that can directly or indirectly link the evidence supporting the traded consignment. This reference is to be used during the certification audit. 

Expand
titleshould stocks be issued per 1st Jan and maintained or can we resgiter intial stock at any convenient time (start new mass balance period)

Response: 

Stock should be issued 1 st Jan 2024, it could be registered at any time.

Expand
titleWe couldn't register a 2023 stock (for example - material: rapeseed (crop)) with NUTS2 method type. How could we register NUTS2 crop stocks to UDB?

Response: 

The NUTS2 values need to be the ones subject to a decision by EC (RED II).

Expand
titleHow can we write down yield losses in the UDB to ensure physical stocks match with mass balance? - Question not answered clearly in my opinion, please clarify

Response: 

We plan to create adjustment/loss feature , In future buyer should be able to include adjustment/loss linked to the consignment  .

Expand
titleHi, just to confirm, the Initial Stock MUST only be as of Jan 1st, 2024? No other future dates are possible?

Response: 

Stock should be issued 1 st Jan 2024,
No other future dates are possible.

Expand
titleWhat is the location for the initial stock? This is not clear.

Response: 

Physical location(site- address mentioned in your certificate)
where you store your stock

Expand
titleCan you add several user rights in one company?

Response: 

Yes . several user rights can be added

Expand
titleCan you upload several transactions at once? For example via excel.

Response: 

Using e delivery you can upload several transaction 

Expand
titleHi, can you explain what is meant by "Initial Stock can be added at the beginning of every mass balance period"? Isn't Initial Stock a one-time exercise?

Response: 

Yes, It is a onetime exercise

Expand
titleI was previously able to log into the UDB but recently I am no longer able because once I log in and am redirected to UDB I receive a "FORBIDDEN" message. Fix?

Response: 

Could you please address to
 EC-UNION-DB@ec.europa.eu through more details

Expand
titleHow does a user know which entry fields are mandatory and which are optional?

Response: 

All mandatory fields are marked with red star on the top. *

Expand
titleEntering new farmers is valid only for 3 mths? FGP may change farmers each year so the possibility to add new supplying farms should be available all the time.

Response: 

Adding sourcing contact(farmer) is available all the time . 

Expand
titleDo we have to create a sourcing contact each time that we have a delivery from a farmer? or what is the deadline to do so?

Response: 

If your sourcing contact is already registered in UDB , no need to reregister .When the delivery happens the new sourcing contact has to be registered.

Expand
titleIf the supplier data has been already delivered for ISCC Hub will it automatically transfer to UDB?

Response: 

If you mean EO details(Suppliers), yes if they are linked to ISCC they should be automatically transferred. 

Expand
titleHow many countries can be entered at the same time? Looks like only one

Response: 

Only one.

Expand
titleWe have 2 plants registered under the same VAT number. Is it possible for 2 plants to be registered under the same NTRID? Last time we receiced an error

Response: 

You can register multiple sites in your ISCC certificate .

Expand
titleContinuing with Ana - so FGPs would have to renew the sourcing contacts every 3 months for those having the default NTR ids? Correct?

Response: 

Currently you are able to upload sourcing contacts without NTR and UDB will generate the NTR, We are giving 3 months of expiry for this sourcing contact. Within this 3 months you should be able to provide a unique reference from your system and not just the name so we can create a NTR template for these sourcing contacts.

Expand
titleSourcing contacts of FGPs like farmers do not have NTR IDS as I understand, as they are not certified under ISCC or at least not all are

Response: 

Currently you are able to upload sourcing contacts without NTR and UDB will generate the NTR, We are giving 3 months of expiry for this sourcing contact. Within this 3 months you should be able to provide a unique reference from your system and not just the name so we can create a NTR template for these sourcing contacts.

Expand
titleWe couldn't register a 2023 stock material: rapeseed (crop) because. "For this method type the Material list is restricted." How could we register NUTS2 stocks?

Response: 

The NUTS2 values need to be the ones subject to a decision by EC (RED II).

Expand
titleCan you add multiple register certificates when creating point of origin buyer trade?

Response: 

No, Currently only one certificate is possible to 
create point of origin buyer trade

Expand
titleWhy loading date is different than delivery date when issuing a PoS for a sale?

Response: 

You can record same date for both.

Expand
titleHow often do we need to create a point of origin buyer trade. As a large operation, could we do this every 3 months for example. It is not realistic by truck.

Response: 

POO should be recorded when you buy the material.

Expand
titleHow will we register in a transaction the "place of delivery", in case of product stored in an independent ISCC Certified warehouse?

Response: 

If the site is certified you should be able to select the 'place of delivery ' while accepting the transaction.

Expand
titleCan you register multiple transactions at once?

Response: 

Currently only one transaction can register,
Multiple register Transaction is Feature for us to implement 

Expand
titleCan UDB provide a mass upload feature for PoO trades as this is extremely heavy workload for collection points?

Response: 

Bulk Upload PoO
is Feature for us to implement

Expand
titleIs mass upload possible?

Response: 

Mass upload will only be possible for sourcing contact . 

Expand
titleCan we register multiple transaction per one delivery date?

Response: 

Yes you can register multiple transaction on one delivery date.

Expand
titleIs it possible to upload transactions in bulk (for example upload 150 transactions in one time)

Response: 

Currently not possible (unless edelivery is being used).

Expand
titleIf it is possible to accumulate transactions, how is this linked with the requirement to enter transaction within 72 hours after delivery?

Response: 

This requirement does not go beyond legislation since the RED II as a higher-level legal act cannot regulate all the details of implementing an information system. Nevertheless, article 28.2 stipulates that the UDB should register all transactions in the value chain. Regarding the 72h, please bear in mind that aggregation of quantities is allowed if the inherent sustainability attributes of these quantities are the same. Therefore, the transaction registration could be based on an invoice that covers an aggregated consignment. 

Expand
titleFor PoO Trades part B: Can UDB provide a mass upload feature for PoO trades as this is extremely heavy workload for collection points?

Response: 

Currently not possible - feature coming soon.

Expand
titleAre you able to give some background on who would use Annex IX, Part B?

Response: 

First Collection Point can use it.
EO must have a valid certificate with at least one of the scope activities.
CP - Collecting Point (for waste/residue material not grown/harvested on farms/plantations)
CNPW - Collector of non-primary residual flows

Expand
titleCan you add multiple certificates for one transaction?

Response: 

No, Currently only one certificate is possible to add in a Transaction

Expand
titleWhat if we are not familiar with the place of discharging of the goods? Is the client obligate to tell the destination?

Response: 

On accepting the transaction buyer would enter the delivery location.

Expand
titleWhen the UDB is fully implemented, can this tool be used as a MB book? Or alongside maintaining UDB, we still need to maintain a MB book?

Response: 

Your MB book is separate and needed by your CB's and Auditor's.

Expand
titleCan you please show the PoS that was generated?

Response: 

On the transaction list view page you should be able to see the POS generated.

Expand
titleWhen I register initial stock is it the same thing as the starting inventory on our mass balance sheet? OR is it stock at each PoO?

Response: 

Both

Expand
titleBy not having the option to upload the transactions in bulk, the UDB will cost us a lot of time. When will the bulk upload option be available?

Response: 

Bulk Upload Transaction is Feature for us to implement 

Expand
titleCan we associate a single POS to several transactions for we have a mass balance where different biomasses and transactions are mixed together?

Response: 

This will not be possible. 

Expand
titleCan you mass approve transactions sent to you?

Response: 

In the current implementation we cannot mass approve transactions.

Expand
titleDo we need to make transaction for every truck or can we make one transaction when total quantity of the deal is delivered?

Response: 

POO should be recorded when you buy the material.

Expand
titleIn what units does UDB allow transactions to be recorded? kg, L, L@15C?

Response: 

You can choose the unit according the selected material.

Expand
titleHow does this 72h is taken into consideration for example when there are bank holidays?

Response: 

The EO has flexibility to decide the trigger point at which the information is sufficiently available for the EO to introduce the transaction on the UDB except for PoS. The examples for trigger points can be – invoice, bill of lading, surveyor report of internal reference that links multiple evidence. These trigger points are to be linked to the evidence being shared to the auditor.

Expand
titleDo you need to accept/transactions sent by supplier within 72h of receiving the transactions in UDB? Or is there a different time frame?

Response: 

The EO has flexibility to decide the trigger point at which the information is sufficiently available for the EO to introduce the transaction on the UDB except for PoS. The examples for trigger points can be – invoice, bill of lading, surveyor report of internal reference that links multiple evidence. These trigger points are to be linked to the evidence being shared to the auditor.

Expand
titleUDB does not allow to select "old" NUTS2 values, but for initial stocks harvested in 2023 old NUTS2 values are allowed?

Response: 

The NUTS2 values need to be the ones subject to a decision by EC (RED II).

Expand
titleWhen will there be any guidelines for the gaseous value chain on how to use UDB?

Response: 

Gaseous Value chain for non-GoO is to go live before 21st November 2024. Testing will be possible on bilateral basis with EOs and TSO/DSO in Q2 & Q3 2024

Expand
title1. When does it become mandatory to use the UDB database? 2.Can we upload sourcing contact data, does it have to be per collection or collectively periodically?

Response: 

Transactions can be registered retroactively from 1st January 2024 based on the initial stocks or transactions received from suppliers after 1st January 2024.

Expand
titleHow will be ensured communication from UDB support team to economic operators which are using eDelivery, when new update features will be uploaded.

Response: 

We will be publishing when a new feature is available - Announcements

Expand
titleNone of our customers are under a voluntary scheme - how can we sell to them within UDB so our stock shows correct?

Response: 

Currently selling to Non certified EO is not available . But we are currently working on implementing this feature. 

Expand
titleI am unable to select the correct certificate number because our number is incorrect. service_udb@iscc-system.org has not been able to help me.

Response: 

Contact your Voluntary Scheme

Expand
titleWill sessions be active longer than 15 mins? To register more information dense transactions, 15 mins might not be sufficient

Response: 

Please try again ,Currently the sessions will be active unto 30 mins.

Expand
titlecan you save a trasaction as draft?

Response: 

Yes, In the transaction if the POS set to 'NO' then it will be in Provisional status i.e. transaction doesn't send to buyer it remains back in seller transaction it can be longer editable

Expand
titleCan you elaborate on what the "method types" are? What is TVD?

Response: 

TDV stands for Total Default Value
TDV fetches the value from the fuel production step only.



Expand
titleRe-raise again for EC comment: Will an EO become non-compliant to RED if they do not have all transactions from 1 Jan retrospectively in UDB by 21 Nov 2024?

Response: 

Repeated Question - ISCC to respond

Expand
titleis a sustainable transaction made in UDB between seller and buyer considered as a POS or does a seperate formalPOS (Blue /Nabisy ) still need to be issued?

Response: 

Every new transaction in UDB create a unique POS . You can refer to the consignment during transaction creation . On the company reference number text field.

Expand
titleWhere fuel is being transported to the buyer, do sellers need to provide the destination of the shipment?

Response: 

Buyer needs to provide the delivery loction when accepting the transaction.

Expand
titleHow do we set up a buyer?

Response: 

As a EO lead user,Go to Organisation->Manage Buyers
In the manage buyer page user able to do a bulk upload buyers
Click on the Download bulk upload template and template fields should be in the below format
 
Example NTR for the Country
Belgium: National Trade Register Identification Type
Should be BE_OND_CD 
A 10-digit number starting with 0.
Example: BE_OND_CD203201340
Company identifier (Machine readable)

Expand
titleAre EOs who are not required to edit GHG data, also required to add in/edit GHG data in the transaction?

Response: 

Once the GHG data is being accepted , there is a limitation on editing .

Expand
titleWhy is country of origin linked to the certificate? Shouldn't it be related to the Origin of the material (e.g. POs)?

Response: 

Country of origin is linked to material source  and combination site.(Refers to the location )

Expand
titleWhy were the ghg emissions empty? Wasn't the corn received with emissions?

Response: 

Depends on which type of GHG method was used , If its  TDV or DDV we dont expect values.If its AV the value should be provided . 

Expand
titleRather than processing transactions on the web application we would like to connect via e-Delivery. When do you expect e-Delivery to be available in production?

Response: 

Refer to eDelivery - Promotion to Production

Expand
titleIs the sustanability data on the sellers side connected to the sustanability data on the buyers side or do we have to put the data in the UDB for both sides?

Response: 

Each material set is unique and should have unique POS from UDB.

Expand
titlewill a POS be send directly to buyers UDB account or will Buyer be able to collect POS from Sellers account?

Response: 

POS will be sent directly to the buyer's UDB account.

Expand
titleIf we would register initial stocks on 1 jan and our supplier gives us a paper POS but no transaction in the UDB for a delivery after 1 jan = mismatch UDB/MB.

Response: 

Mass balance is considered between entry and three months.

Expand
titleProcedure in case of tolling agreement: Does the biofuel producer transact formally the amount to the tolling agreementcompany or producer transact to the buyer

Response: 

For Example: Yes,Farm A processes harvest crops for 
Pom B under a tolling agreement, this would be considered a transaction.  

Expand
titleWhy were the ghg emissions empty? Wasn't the corn received with emissions?

Response: 

If corn was received with TDV or DDV GHG methosd types we don't expect any GHG values. If corn received with AV method type linked GHG values is expected and mandatory.

Expand
titleEC-UDB-SUPPORT@ec.europa.eu is not responding to my emails about my inability to sign into UDB due to "FORBIDDEN" error. What should I do?

Response: 

The forbidden status happens where there is a lot of retries and 
manually updating the url. For security reason the login in denied for 24 hours.

Expand
titleCan the Initial Stock registration be as of another date instead of Jan 1st 2024? For eg, March 1st 2024 if that date is a beginning of a mass balance period?

Response: 

Initial stock is the quantity available to the EO at a particular site as on 1st January 2024. Stock should be issued 1 st jan 2024,
No other future dates are possible.

Expand
titleHow should entities which are not certified under a Voluntary Scheme onboard onto the UDB? Contact the Commission directly?

Response: 

Non-certified Economic operators like fuel suppliers and consumers can be onboarded . There will be a possibility for them to self-register using a website link and start using the application. 

Expand
titleif a seller loads from place A for example 2000 mt and the buyer receives in place B 1995 mt how is this shortage accounted for in UDB?

Response: 

We plan to create adjustment/loss feature , In future buyer should be able to include adjustment/loss linked to the consignment  .

Expand
titleTrader with storage does processing?

Response: 

Trader with storage will not be allowed to do any process, this restriction on material process will be done as soon as possible.

Expand
titleHow could we register the loss of product due to logistic matters?Such as difference loading (input),and unloading (output) on vessel after ocean transit period

Response: 

We plan to create adjustment/loss feature , In future buyer should be able to include adjustment/loss linked to the consignment  .

Expand
titleHow can we do the material process if we produce one bach with differents suppliers?

Response: 

Input material can be multiple and output material can also be multiple each would have a diffrent POS's.

Expand
titleIs there a way to process multiple product at the same time with a excel file by example ?

Response: 

In the current implementation ,Material processing cannot be done using Excel.

Expand
titledo I understand correctly that the GHG values entered for the conversion are the actuall processing values added to the values of the input material?

Response: 

If for Intermediate product or fuel created after conversion used medoth type is AV , Then cumulated GHG would be based on the input material AV values plus AV values added during the conversion.(AV of input material+AV added during conversion) 

Expand
titleWhy is Hydrotreated Vegetable Oil material (URW007) considered as Raw material (under material type)? Shouldn’t be corrected to Fuel instead?

Response: 

We will add  Hydrotreated Vegetable Oil material also as a Fuel .

Expand
titlethis POS issued is a internal POS correct? This conversion POS is to be further distributed (splitted/ combined) to the receiver of the biodiesel correct?

Response: 

Convertion is distinct / output 

Expand
titlePlease could you share the “scope of activities and features of use” table and the trade flow diagram which was shown at the start of the presentation?

Response: 

Refer to User Guides / Demo Video's

Expand
titleFor after the webinar, How will M.B. adjustments be recorded? Is there a new Initial Stok Registration at the end of every M.B. period?

Response: 

We plan to create adjustment/loss feature , In future buyer should be able to include adjustment/loss linked to the consignment  .

Expand
titlePlease can you confirm, that it will be possible for us as ISCC certified economic operator, to directly connect UDB via eDelivery without AP provider.

Response: 

Refer to eDelivery - Promotion to Production

Expand
titleCertified Companies which buy fuel already blended with biofuels and sold it to non certified companies (gas stations) should declare these transactions to UDB?

Response: 

Yes, non-certified companies will be onboarded on UDB after April and they will have to submit transactions on UDB until the Obligated parties (final fuel supplier) who puts the fuel on the market by providing additional details like customs & invoice reference.

Expand
title If YES, should all of these transactions to be declared one by one (for each different VAT number)

Response: 

NTRID in the formr VAT or Business registrations number would be useful. It is best to agree with your buyer (counterparty) which NTR ID they will use. so that they can receive the transactions on UDB

Expand
titleor could we consider all these transactions as one and declare all the quantity to NON CERTIFIED entities in just one transaction.

Response: 

It is possible to aggregate and needs to align to the physical movement evidence example: Invoice.

Expand
titleI did not received an invitatio nso far whilst the UDB registratio as EO is OK according to ISCC. How to proceed?

Response: 

Union Database for Biofuels - Start of registrations

Expand
titleMy certificates and site information are incorrect, is this normal? I have contacted ISCC many times but no respond, do we have to wait until ISCC HUB is ready? Christian Laemmer for TotalEnergies Fluids SAS

Response: 

For certificate related updates queries please contact your voluntary scheme

Expand
titleWe have to do a lot of manual activities with possibile errors, for example in Stock selection. How can we manage it if we cant cancel? (es.Material processing)

Response: 

Cancel option is not available in material processing now.It will be implemented soon.

Expand
titleHow can we proceed to enter the initial stock if we are at the beginning of the mass balance period and we have a negative mass balance?

Response: 

As of 1st January 2024, if you balance is negative then you do not need to encode the initial stocks

Expand
titleWhat it is meant with product permit number? Do certified PoO have to provide it?

Response: 

It refers to Waste or animal by permit number - optional field. Yes Point of origin should provide this information.

Expand
titleWhy is GHG always positive? What about the cases where the reductions are bigger than the emissions (manure for ex)?

Response: 

Total emissions with negative values will be possible. restrictions will be removed next week.

Expand
titleWhat is support fields? Sorry I missed the beginning of the demo, you have maybe already talked about it.

Response: 

Support received is related to any from one of these - Feed-in tariff
Feed in premium
Contracts for difference
Consumption support (tax breaks)
Consumption support (mandates)

Expand
titleWe got ISCC certificate on Dec 2023 and would be included in the next bulk upload to the UDB meantime. When can we expect to receive link to the UDB system?

Response: 

If you would like to seek access to LIVE environment , please contact your voluntary scheme.

Expand
titleLet me rephrase. Is it mandatory to retrospectively register older transactions from 1st Jan - to the date we start registering transactions? It could be 1000s

Response: 

Yes, it is required for transactions to be registered after 1st Jan 2024 (hence expost registration is allowed). If the transactions are not registered on UDB then such consignments cannot be counted for targets by a Member State.

Expand
titleIs it possible to create « view only » accounts?

Response: 

Could you please clarify the scenario by elaborating what context / need for it. It may be possible but we will have to prioritize based on specific need.

Expand
titleis the waste/permit number specific to the current holder of the waste material or is it fixed from the first collector?

Response: 

It is generally at the point of origin or the first collector. Once encoded on UDB it will be available in the value chain for the consigned as per the  Annex I

Expand
titleFor my initial stock registration, material list is not clear and I do not know what to use. What is the difference between annex III and V?

Response: 

Fuel list in RED is reffered by production pathway and the fuel name to identify it correctly. Please eithere refer to your certification or the list in with description extracted from RED. These references will determine the application default GHG valuesas per RED

Expand
titleFuel list in RED is reffered by production pathway and the fuel name to identify it correctly. Please eithere refer to your certification or the list in with description extracted from RED. These references will determine the application default GHG valuesas per RED

Response: 

There is no deadline set currently on the application for registering initial stocks.

Expand
titleWe just only buy molasses, store this, and sell this. No processing. What do I need to record in UDB? And what my supplier?

Response: 

Inital stock to be registered for Molasses as of 1st January 2024. Accept incoming transaction when your spplier deliver. Submit seller transaction when you sell mollasses to the buyer

Expand
titleCould you please confirm that the IS is the stock owned by the EO on 1-1-2024? Would this date change depending on the date the EO is registered in the UDB?

Response: 

This is a one time use feature and will not change and meant to register stocks held as of 1st January 2024. If the EO was registered after this date then the transactions should be registered directly via other feaures.

Expand
titleHow long will registration of initial stock wiil be available ?

Response: 

There is no deadline set currently on the application for registering initial stocks.

Expand
titleFor a Trader (no production, no consumption) what are the obligations in term of initial stock ? will the UDB provide real time mass balance position

Response: 

If the trader has storage initial stock can be registered as of 1st Jan 2024. It is optional. At any point in time every EO can view the available stocks.

Expand
titleCould you please share a full guide via UDB Wiki on how to use sourcing contact template? (e.g. expected values, expected field format, possible restrictions)

Response: 

Please refer to the UDB User Guide and Demo Video’s : User Guides / Demo Video's

Expand
titleIs a multiple registration in UDB necessary if we are registered within several schemes? To be more particular - national and ISCC?

Response: 

All certificates and voluntary scheme need to be register their EO. One EO will be registered only once on UDB. But will have to be linked to multiple schemes. If the schemes faces trouble for this situation they can contact UDB team. 

Expand
titleCan we have mass bulk Excel upload for initial stock registration?

Response: 

Currently bulk upload for initial stock registration is not available. This option will be available in upcoming future releases

Expand
titleCould you please indicate if there is a deadline for the registration of the initial stocks?

Response: 

There is no deadline set currently on the application for registering initial stocks.

Expand
titleSaw in the screen that Default NTR id will expire in 3 mon. after creating. With residential addresses there're no NTRids, so EO must redo them every 3 months?

Response: 

Default NTR will expire in 3 months for sourcing contact.
3 months period starts from the day the Sourcing Contact is created in UDB.

Expand
titleWhere do you find the template for bulk uploading?

Response: 

In the manage sourcing contact click on "Download Bulk Upload Sourcing Contact Template"to download the template.

Expand
titleFor initial stock that is physically stored in a3 rd party facility but for which ownership is given EO. Who does the registration of the initial stock?

Response: 

If the 3rd party is only storing the initial stock, EO (Owner)of the stock. 
In parallel The 3rd party facility should be registered under your certificate in UDB as a site.

Expand
titleDo they ALL sourcing contacts have to be uploaded (I have thousands)? If so is there an option to update or bulk upload more than once?

Response: 

Yes,in the manage sourcing contact click on "Download Bulk Upload Sourcing Contact Template"to upload bulk data.

Expand
titleDo the owners of intermediate storage need to be registered in the UDB even if they are not at any point the owners of the product?

Response: 

If an EO is selling the material then the EO must declare the storage in his certificate as a SITE.

Expand
titleCould you please confirm that the “material processing” transaction applies to any type of biofuel production including co-processing?

Response: 

Yes..It would be possible for any type of material.

Expand
titleIn uk how do you get an ntr id for someone who isn’t vat registered or a ltd co as I understand these are the only means to get an ntr id?

Response: 

Currently VAT is not mandatory for  creating sourcing contact.
National Trade Register Identification number automatically generated by clicking on "Generate default NTR" after selecting country

Expand
titleIm a collecting point for uco but do not have sourcing contact as an option

Response: 

For Collecting point for uco we have sourcing contact option

Expand
titleFGP/CP maybe have thousands of PoO/Sourcing Contacts. They have to find a way to bulk upload these transactions. It is not viable for companies all this work

Response: 

In the manage sourcing contact click on "Download Bulk Upload Sourcing Contact Template" to upload bulk data.
For FGP transactions bulk upload for buyer trade is not available. This option will be available in upcoming future releases

Expand
titleIf a trader buys POME Oil from certified POO(mill), how can we register stock

Response: 

Trader without storage dont have to register the initial stock.

Expand
titlehow is the procedure for the registration of new materials?Does the UDB need to approve the registration? How is the code assigned to the new material?

Response: 

The new raw materials or intermediete products can be requested by the scheme when the materials can be indentifiable specifically & uniquely i.e. it should not be a category. Additionally the scheme has to provide descrption. These materials will be added if they dont already exist. For fuels the fuel has to be approved & published by EC before it can be listed on UDB.

Expand
titlewe are certified as Biodieselproducer, but also as PoO for e.g. TER. How can we "create" our TER within the UDB and how to process to biodiesel?

Response: 

As PoO, the possibility to add material directly will be enabled. The processing can be done using the feature material processing feaure

Expand
titleDue to weighbridge variances between supplier & CP is there a facility to accept small variances from suppliers and write down the balance in-line with our MB?

Response: 

This should not be any different from current process. UDB is only digitizing the information. If necessary lossess feature can be provided to remove the losses due to any process. Please clarify if this is the case.

Expand
titleNo the PoO that are we, is we generate AF cat 2 & 3 from ABP cat 2 and 3. No trading or processing

Response: 

The collecting point buying from POO can register in this case. Please write to us if the case is different.

Expand
titleCould you please confirm that no further transactions can be registered if the PoS from the first transaction has not been uploaded?

Response: 

This is correct. If the Pos is not marked as complete. the transaction will not reach the buyer. 

Expand
titleI am a collecting point with approx 3000 sourcing contacts, do you expect us to select poo’s from a list?

Response: 

Currently able to select one sourcing contact from the sourcing contact dropdown list in FGP trade

Expand
titleFor UCO we used to received from PoO, Eec zero, Ep, zero, Etd_DDV. It means final value is equal zero, without DDV. Can you please try this variant.

Response: 

This scenario possible in DDV, AV & DDV_AV to save the final value is equal to zero in POS.
Yes,In UCO if we select 'DDV' as method type " At least one DDV method type is required" i.e GHG Emissions any one field is required to complete the POS data. 

Expand
titleHave you considered that a restaurant can only produce a few liters per month of UCO? This means that for an entire year, it could represent up to 400,000entries

Response: 

The 1st Collection point can aggregate the UCO across multiple restaurants and by specifying the portion from each restaurant in this aggregation for example per month.

Expand
titleIf the SC is certified, have we also add it in previous step? Could we add a SC transactions from certified PoO which are not included our list of SC

Response: 

If Point of origin is certified it is not necessary to add them to SC. However it is allowed to add to SC as an option.

Expand
titleAPI question. Which API service should I call to cancel initial stock registration? Or it is only possible to do from the web site?

Response: 

API to cance; initial stock is not implemented yet , you should be able to cancel stock created as long as its not been used in an transaction.

Expand
titleCan we accumulate and record collections from 1 PoO on a monthly basis?

Response: 

Yes, it is possible as long as the consignments have unique foot print i.e. same country of origin and emission footprint.

Expand
titleDue to weighbridge variances is there a function to adjust incoming stocks put into your mass balance?

Response: 

The incoming quantities cannot be edited currently considering the small variances. If necessary we will consider where the variances are limited by certain amounts. The scheme can make a proposal.

Expand
titleCan I create an outgoing Sale to parties not registered in the UDB? Some buyers are not certified at all.

Response: 

For Non-certified Economic operators like fuel suppliers and consumers can be onboarded in around March. UDB team shall notify you which can be further passed on to the EOs. There will be a possibility for them to self-register using a website link and start using the application. Training for non-certified economic operators begin only after March, You will get a notification email when the training slots open .
Meanwhile , You could refer to https://wikis.ec.europa.eu/display/UDBBIS/Union+Database+for+Biofuels+-+Public+wiki
F&Q’s – https://wikis.ec.europa.eu/display/UDBBIS/FAQ+-+UDB

Expand
titleIs this form used also for final consumption, e.g. in case of fueling stations? Who is the counterparty in this case, if the customers are not registered?

Response: 

UDB stops at final fuel suppliers / obligated parties and will not cover retail customers. In the case large wholesale customer, Final fuel suppliers can indicate the customers by NTR ID & country where the fuel is put on market. Subject to additional legislations end- customers like Aviation / Airlines operators will have access to UDB. In other sectors currently end-customer who are consuming the fuel will not have access unless this is for transformation into Gas or liquid . 

Expand
titleAre only transactions of Liquid fuel subject to registration in the UDB or also hard biomass fuels such as sunflower husk pellets?

Response: 

solid biomass fuels are not covered by UDB

Expand
titleAs a trader, do we need 2 separate logins as a seller and a buyer?

Response: 

Yes,it can be two separate logins or one login For Example: one accounts can be linked to multiple organisation

Expand
titlein the registering of the transaction, when you select the site: does it need to be a site registered under the seller?

Response: 

Yes,in the transaction site dropdown list show after selecting the certificate which is linked to the organisation 

Expand
titlePos data in sales transaction, you only add GHG data if you want to add on add GHG emissions? Ie Traders would leave it blank.

Response: 

In the sale transaction POS data 
If we select AV as method type
in GHG Emissions "At least one E field is required" and it is mandatory.
If we select DDV as method type
in GHG Emissions"At least one DDV method type is required" and it is mandatory.
If we select DDV_AV as method type in GHG Emissions
"At least one DDV and one AV method type is required" and it is mandatory.

Expand
titleSo sustainability characteristics have to be performed outside of the UDB. Example feedstock factors or moisture factor adjustments?

Response: 

UDB is not tracing these information

Expand
titleWhat will lead, the issued SDs or POSes to fill in this data in the UDB? Or the other way around , the SDs and POSes are made on the basis of the UDB data?

Response: 

The sustainabiliy declarations & PoS data is encoded by Economic Operators which forms the digital declarations on UDB further information about consignment as per Annex I. These information will be used by auditors during certification audits.

Expand
titleWill I have to recreate the transactions as well in national databases (nabisy, carbure)?

Response: 

EO have the obligation to register the transactions on UDB since UDB traces the fuel from the raw materials. Nabisy and Carbure is a reporting system and not a tracability system. Nabisy and carbure are working towards integration with UDB as a hub. If the member states would like bidirectional integration then it will require member states to fullfill the traceability requirement to encode transactions into UDB i.e. the raw materials consignment registered on UDB have to be linked to the fuel consignments

Expand
titleHow we can manage the change of VS. When we received material under REcert EU and need to sell under ISCC EU.

Response: 

As a EO lead user only can possible to manage the change of VS.
Navigate to Organisation ->My Organisation page click on 'Edit' in the General information section to add the required Voluntary schemes.

Expand
titleYou explained how to set up a sale. But can you request a purchase using the UDB?

Response: 

Initiating purchase is possible for 1st gathering & 1st collection point only. As a buyeryou can accept the incoming transaction registere by the seller.

Expand
titleSometimes we sell product to other level entity ‘in tank’. With no transport. Product stays on same address (loading=delivery address) Assume this is possible.

Response: 

Possible using internal transfer option. Transaction can be created for the 

Expand
titleIf we have material received in tonnes can we sell product in m³ or liters?

Response: 

Units cannot be changes when creating seller transaction , but possible on Conversion.

Expand
titleAs for 72 hours could anyone answer responsibly for this? No generic & abstract answers. There is no legal base for 72 hours. Please do not add more bureaucracy

Response: 

This requirement does not go beyond legislation since the RED II as a higher-level legal act cannot regulate all the details of implementing an information system. Nevertheless, article 28.2 stipulates that the UDB should register all transactions in the value chain. Regarding the 72h, please bear in mind that aggregation of quantities is allowed if the inherent sustainability attributes of these quantities are the same. Therefore, the transaction registration could be based on an invoice that covers an aggregated consignment.

Expand
titleIf the seller (trader) is selling to vessel for its propulsion, do we have to register the sale in UDB?

Response: 

Yes, the end use into transport sector (Maritime) is to be encoded by final fuel supplier.

Expand
titleYou are mentioning that some of the features (e.g. UoM conversion) will be possible, does it mean that they will be available once UDB becomes mandatory?

Response: 

It is possible to convert from one UoM to another UoM using the material processing feature today.  

Expand
titleCan UDB team share details on your development plan in 2024 (e.g. in Wiki page)? We would like to receive more frequent updates and upcoming changes

Response: 

You can refer to the Release Notes shared in the public wiki.

Expand
titleCan I add more than one output product?

Response: 

In the curent implmentation  material processing can be done with multiple input material and one output material, with a maximum of 5 waste.

Expand
titledoes material/conversion transaction apply to co-processing?

Response: 

Yes

Expand
titleWhat is the implementation timeline for National schemes? How will it be addressed that they can have different rules regarding e.g. mass balance boundaries?

Response: 

National schemes should have the same Mass balance rules since they need to comply with RED II

Expand
titlewith over 1,000 transaction per month is there a mass uploading option to reduce administration burden?

Response: 

It is forseen that service provider can assist in such situations for mass uploading or via EOs IT systems integration with UDB via Access point provider. For these 2 options, please contact your scheme. 

Expand
titleWhen are mass balances closed and no longer able to be edited with e.g. PoS data?

Response: 

The trade transactions are to be registered as per the reality and evidences to be submitted to auditors. During the transition year (2024) there will not be any restriction to as the EOs are allowed to register transactions exposte.

Expand
titleDoes UDB allow changes in the mass balance periods of a certified EO? How can the period be adjusted in UDB?

Response: 

Yes, Changes can be requested to Certification Body. Only schemes/CB can change the mass-balance period.

Expand
titleI the process takes several dates, which date apply for this case?

Response: 

The date used shall be relatable to the evidences used during the certification audit. The reference to this is based on both trade data & Company reference number (Internal numbers for process or surveyor report as applicable & required by the certification scheme etc)

Expand
titleHow I can manage material not suitable anymore to be processed?

Response: 

Yes, material cannot be used in a transaction it is possible to manage the delete and edit the stocks.
If that material is used in a transaction then it is not possible to edit and delete following message would appear
"Unable to edit as the pos was used in a Transaction/Material process"

Expand
titleCan the guides be updated with Last updated date? They seem out of date. FAQ answers contradict many answers that have been given here today.

Response: 

Updates ongoing by the UDB team.

Expand
titleWhen is it mandatory? If we are using and others not then this would leave gaps between our mass balances and the UDB. Gaps seen as non-conformance from ISCC?

Response: 

All EOs are required start using as soon as they are onboarded. If EOs are not complying to the certification schemes communication, they may temporaily suspend the certificates of such EOs. Legal deadline for UDB to be full operational is November 2024. 

Expand
titleWil UDB or ISCC set up an online support or help-line during this first stage of the UDB implementation? Or where can we address our specific questions?

Response: 

We are happy to support on the initial UDB implementation phase, you could Email to - EC-UNION-DB@ec.europa.eu . udb@iscc-system.org for support . Meanwhile you can also refer to user guide and demo video's published in the WIKI page.

Expand
titleWhen will EOs in the gaseous supply chain have to start registering their accounts in UDB?

Response: 

Gaseous Value chain for non-GoO is to go live before 21st November 2024. Testing will be possible on bilateral basis with EOs and TSO/DSO in Q2 & Q3 2024. All interested EOs may contact UDB Team. For GoO, registries who would want to start the integration may contact UDB team for bilateral session as per the communication in the last focus group in December 2023.

Expand
titleCan UDB team share documentation on your data access policy (who see what data), incident response plan (what if UDB is offline / display incorrect data)?

Response: 

Regarding the Data Policy and  Protection, Please refer to the following link
Security

Expand
titleHow to handle ISCC Compliant claim? Will UDB support this? or will ISCC make it obsolete?

Response: 

Contact ISCC . UDB Team will not be able to support on this.

Expand
titleMaterial processing
Expand
titleIs there actually an error event on the UDB database as the site is not loading fully (I've tied 2 different browers)?

Response: 

A guideline for material processing will cover most of these questions.

Expand
titleScope: to be specified? Is it the type of processing (e.g.: Trituration or Esterification)

Response: 

If the scope of site is meant here, then the scope of materials valid for the site is what is meant. This should also be specified in the certificate & is normally the responsibility of VS.

https://webgate.ec.europa.eu/fpfis/wikis/pages/viewpage.action?pageId=1288537159

If the scope of an EO is referred to here, then it is as per the definition in the certificate. Please refer to the below link about the possible values of scope of EO.

https://webgate.ec.europa.eu/fpfis/wikis/display/UNIONDB/%28Draft%29+Scope+of+Economic+Operator+-+encoding

Expand
titleDate of processing : can we group by week or month ? NB: We do not have this information in our systems today

Response: 

Date of processing can be grouped as long as the emission characteristics for processing within the date range is constant. i.e. The EO may chose to use the last day of the week or month to apply conversion.

Expand
titleIs it possible to automate the implementation with industrial yields? We have the impression that the UDB imposes an entry for the input and one for the output, in fact, the two are correlated and this would avoid an additional operation

Response: 

The conversion allows indeed input or output material & quantity. In such case UDB can recognize the yield at site level but not necessarily at each individual step unless those steps are registered on UDB for each processing step / material created. Implementing a standard yield approach would mean further corrections in subsequent stage for rounding off or variations. We understand that there is no standard yield that can be applied through out the year. Hence this approach is universal for all types of processing. In such cases using a standard yield may not provide accurate information to UDB about the reality to the auditors during audits thereby the reliability of information on UDB.  

Expand
titleWhat is the assignment of POS during an implementation?

Response: 

A batch of input materials with same emission characteristics when converted to an output materials, a new PoS is generated by UDB. An EO will be informed about the different consignments (unique emission & origin characteristics) that he converted in order to use them for future trades. The implementation specifics both on online & e-Delivery will be explained in the guidelines.

Expand
titleHow to manage downgrades or losses in line

Response: 

Losses can be adjusted during conversion process. Alternatively UDB will provide an feature to adjust losses during mass-balance period.

Expand
titleHow to manage transfers between sites?

Response: 

Transfers between sites for same EO & same certificate will be enabled.

Expand
titleHow to manage contract work (when we crush for other actors, or when other actors crush for us with a service contract)

Response: 

If the crushing activity is executed at the same site and can be uniquely identifiable on UDB as a new material name then this can be registered on UDB using a trade transaction. In the case where the material name is same after crushing & there is a need to recognize the losses after crushing in terms of quantity then the losses features can be applied.

Expand
titleExplain which scopes are allowed to register a conversion. (background: during testing, we have managed to register conversions under the scopes first gathering point).

Response: 

Currently there is no restriction. But this will be restricted soon to EOs who are modifying or converting the materials.

Expand
titleClarify if EOs can aggregate material processing, and on which basis (weekly, monthly, etc.)

Response: 

Yes, this  can be done and is up to the EO to manage the level of granularity subject to common emission method type, conversion factors and evidence that will be used during the audit.

...